Travelling block also has sheaves over with the drill line is passing and it hanged with the crown block with the help of drill line. Its lower part is connected by rotary hook, which holds all the equipment, which is to be run into the well.
It is a wire line which is made of many strands.it is wound over draw works and passes through the sheaves of crown bole and travelling block many times to increase the maximum hoisting capacity slacking or drilling line with the help of draw works move the traveling block up and down.
Draw works or hoist is rotating drum over which the drill line is wound. The driller moves the travelling block up and down operates cat head to make or break pipe connections and rotates and rotary table with the help of draw works.